Home / Projects / Water Supply Project / Composite Assembled Water Tank
Composite Assembled Water Tank

mingxing

Composite Assembled Water Tank

Products used: Buried smart fire pump station
Effective volume: 1298 cubic meters

Project Introduction

The total construction area is over 40,000 square meters, the building height is 23.15 meters, the total length of the project is 208.6 meters, and the width is 159 meters. There are three floors in the hall, divided into a sports area, service area, physical training, and rehabilitation center. It is currently the most complete extreme sports venue in China with the largest single area. At the same time, it also built the world-famous "space wind tunnel" for the first time, and has the largest indoor surfing area in the world. Inside the venue, there are extreme sports venues, indoor surfing venues, and space wind tunnel venues that meet international competition standards.

Project Engineering